A good day out…
Thursday 19th November, 7.30am, the weather misty and murky. Four members of the SRC – Dave Cartwright, Paul Denton, Terry Robinson and Nick Palette – set out on a journey to mid-wales to visit Geoff Taylor and his superb model railway depicting the route from Ruabon to Barmouth.
Geoff lives in Bwlch-y-ffridd near Newtown. It is a journey where the first 50 miles is covered in far less time than the remaining 30 miles! Once past Shrewsbury, the roads gradually get narrower, the bends sharper and the hills steeper! However, it is well worth it as once you arrive you are treated to hospitality that is second to none plus the prospect of operating one of the best home layouts there is.
The layout is situated in a shed measuring about 25ft by 20ft in Geoff’s garden, which itself is a sight to behold with its babbling stream running through it and the birds constantly flitting to and fro on the bird feeders.

The layout was built to replace Geoff’s earlier layout, Penmaenpool, which is now in the hands of the Wirral Finescale Railway Modellers and made its exhibition debut earlier this year at Macclesfield.
Construction on the current layout started around 3 years ago and it is amazing to see how much has been done in that time. There is the old adage that a layout is never finished but this one is pretty close to it. All the track is ballasted and the scenery is in place. The layout is operated by a recently installed Digitrax DCC system which replaced the 20 year old Lenz system.
The layout features scenic locations – Trevor, Bala Junction and Bala. Hidden staging facilities are at each end – Ruabon and Barmouth. There are non-scenic locations for Corwen and Blaenau Ffestiniog.

Trevor, Bala Jct and Bala Town

Ruabon

Barmouth
The design of the layout makes ingenious use of the space by incorporating a convoluted route using hidden non-scenic runs between the scenic sections allowing several prototype miles to be portrayed in the given space.

All signals are operational and that includes the ground signals. How many layouts actually feature ground signals, never mind ones that work?

The layout is operated on a computer generated timing programme. Each location is equipped with a computer screen and shows a time slot and the movements that are required at that time. A rudimentary block instrument facility communicates between each location and advises when trains are ready. Each movement is controlled by the receiving location, i.e. you drive the train towards you. Each location has its own panel with switches for signals and turnouts.

As one would expect given Geoff’s modelling ability, the buildings are mainly scratchbuilt and based on the respective prototypes and the scenery is also expertly executed. Likewise, with only a few exceptions, the trains ran flawlessly and did what they were asked to do. We did have a slight glitch after lunch when the whole system shut down but with some online help it was recovered and operations resumed.

We finished at around 5.30 having covered around 3 hypothetical hours of operations. Everybody was in agreement that a good time was had by all despite the slight pause early in the afternoon.
A huge thanks to Geoff and his wife for their hospitality. We are all looking forward to the next opportunity we have to visit.
Here are some more pictures from the visit.



